含羞草研究社

Skip to content

Okanagan Lake Dam review necessary to prevent surprises: dam manager

With more extreme weather events forecasted, we need to be ready for them
26757231_web1_211007-KCN-new-dam_1
The Okanagan Dam, pictured in 2019. (Okanagan WaterWise/Facebook)

It may be structurally sound, but a deeper look at the system as a whole is important to effectively manage a large body of water and be ready for the effects of climate change.

That is what Okanagan Dam manager Shaun Reimer had to say about a recent report that the Okanagan Basin Water Board (OBWB) executive director Anna Warwick Sears submitted to the province, which asks for funding for a variety of issues, including reviewing the operating system and eventually replacing the dam located in Penticton.

Reimer said the dam is actually closer to being 70 years old but is structurally sound and seismically safe. That said, however, the whole system that manages lake levels can always benefit from a review so we can prepare for more extreme weather events.

含羞草研究社淓specially considering the age (of the dam), it含羞草研究社檚 held up pretty well,含羞草研究社 he said.

含羞草研究社淲e don含羞草研究社檛 actually have any real concerns in terms of a structural issue含羞草研究社 but considering the issues we will be having in the future, with more extreme weather events, we do really want to take a look at how well the entire system will hold up under those conditions, and we含羞草研究社檙e working towards that.含羞草研究社

In her report, Warwick Sears said the province needs to start planning for a new one very soon.

含羞草研究社淚t is inadequate for managing future floods含羞草研究社 given the increased volume and frequency of floods as a result of climate change, and the Province of B.C. needs to begin planning for its replacement,含羞草研究社 she said.

含羞草研究社淔looding is projected to become much more common in the next few decades, damaging public and private infrastructure at great cost.含羞草研究社

Reimer said he含羞草研究社檚 well aware of the changes in weather patterns and behaviours and is responding to it as best he can at the dam.

含羞草研究社淲ith some of the estimates of what the weather and the events that are going to happen due to climate change, going out maybe 20 or 50 years from now, then I don含羞草研究社檛 know that we would be able to manage within the confines of the existing system,含羞草研究社 he said.

含羞草研究社淭his is why we want to get ahead of it, not get caught by surprise含羞草研究社 nothing is going to be done overnight and we have to put a lot of thought into this so we do get it right in the end, so that we can address all the interests and concerns, address First Nations concerns and water supply concerns. Those will all be part of the conversation.含羞草研究社

READ MORE: Okanagan Lake Dam called 含羞草研究社榠nadequate含羞草研究社 for flood mitigation



twila.amato@blackpress.ca

Like us on and follow us on .



Twila Amato

About the Author: Twila Amato

Twila was a radio reporter based in northern Vancouver Island. She won the Jack Webster Student Journalism Award while at BCIT and received a degree in ancient and modern Greek history from McGill University.
Read more



(or

含羞草研究社

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }